Archives: Case Studies
Witchampton F.C
Some of our guys joined Witchampton FC, we decided to offer parts and labour as sponsorship as the clubhouse was in dire need of a refresh.
Read Case StudySovereign – Isle of Wight
Sovereign required ‘Plant Room updating’ works to be completed at two sites on the Isle of Wight. The plant room systems were out of date causing boiler failures.
Read Case StudyQuantum
Quantum was redesigning their office space. They instructed an interior design company, and we were contacted due to being recommended to Debbie the Managing Director.
Read Case StudyBristol Maid
The property is a very large site that is used for production of hospital equipment. The client provided us with their annual shutdown period to do maintenance. In this two-week period, we were asked to complete an upgrade of all their lighting.
Read Case StudySovereign Plant Rooms
Sovereign contacted us last year to ask for ‘Plant Room updating’ works to be completed. The plant room systems are, in most cases, out of date causing boiler failures.
Read Case StudySpaceway South Ltd
The size of the warehouse is approximately 3000 square metres. The client was extending their current premises by adding more floor space with a mezzanine, nearly doubling their storage area.
Read Case StudyPre-Planned Maintenance (PPM) – Burns Hamiliton
Burns Hamilton Ltd one of the leading Property Management companies in Hampshire and Dorset. They have been a client of ours for over 15 years. We carry out maintenance for a good 80% of their properties.
Read Case StudySpaceway South Ltd
The size of the property is approximately 20,000 square foot. The project was to install all new lighting, dedicated and general power, services for welfare facilities, and an office-fit out.
Read Case StudyCutwrights
The premises is a 30m by 35m brand-new unit. It was a bare shell, with minimal fire alarm and electrical installation, only a basic distribution with a few lights in the office plus facilities (toilets).
Read Case StudyGrotto and Winter Wonderland
Family-run business, Stewart’s Garden Centres, wanted to change the way that their Grotto’s and Winter Wonderland’s are set up, ready for Christmas.
Read Case StudyCutwrights Fire Alarm
Cutwrights uses the latest in automated machinery to provide the ultimate cutting, edging, and drilling service, across a huge range of boards and finishes. The company is moving from London to Fleets Corner, Poole.
Read Case StudyParkstone Yacht Club
Parkstone Yacht Club was established in 1895 and is situated on the north shore of Poole Harbour. The lights in Parkstone Yacht Club’s car park were in a poor state of repair and required replacement with modern LED light, of better performance.
Read Case Study- 1
- 2